- Overview
- Product Description
- Company Profile
- After Sales Service
- FAQ
Basic Info.
Product Description
BMC/SMC/DMC Mould,mold
1) Equipment: We own Stamping machines, Hydraulic press machines, Auto-Turning machines, CNC-Turning machines, Milling machines, Precision wire cutting machines, more than 160 sets in total;
2) Material: iron, carbon steel, stainless steel, brass, copper, alloy steel, aluminum, cold rolled steel with various plating;
3) Surface treatment: kinds of plating (Zinc, Nikel, Chrome, Tin, Ag); Painting, Powder, Anodizing, E-coating, Silkscreen, Heat treatment, Black oxid;
4) Standard/ specification: OEM service as per customers' requests, within-house tooling design & fabricating;
5) RoHS compliance for export
6) Quality assurance in accordance with ISO9001:2008
7) Concurrent engineering capability on product design
8) Just-in-time manufacturing capability to meet customer's requirement
9) Tailor-made packaging method according to customer's requirement
1.Mould details:
Product Name | Power press dies |
Material of Die | D2, SKH-9, SKD11, A3,SKD61 etc. |
Design Software | AutoCAD, PRO/E |
Die Type | Stamping press moulds , stamping die, punching die, sheet metal mould , progressivedie, terminal die,single die, double die or according to your parts |
Drawing format | igs,stp, prt, asm, pdf, dwg, dxf |
Die Life | 1,000,000-3,000,000 shots |
First Trial | 15-25 days after mold drawing confirmed |
2.Mould building process
Step | Item | High speed stamping die |
1 | Quotation | Quote competitive price according to your details (drawing or sample, and related requirements). |
2 | Order | Sign agreement after confirming price |
3 | Mould design | Design the mould structure drawing according to your product drawing or sample, then send to you for confirmation. |
4 | Mould making | After your confirmation of our drawing, we begin to make the moulds, during manufacturing program, we send you mould building progress with pictures every week, for you to know our process. |
5 | First trial | We will make the stamping die first trial on time, then send you video or picture and trial samples for you to confirm. Or you can also come to our factory .And we will inspect them and issue the report. |
6 | Quality confirm | You will confirm our stamping die quality according to sample. If you need to adjust the product structure, we can help you to change it further. |
7 | Delivery | Ship the stamping die after it is completely OK, packed by wooden case. And together with mould, mould detailed drawing, mould label will be also delivered. |
We are currently reviewing our product packaging from the angles of waste-reduction and resource-saving. We are also working on improving transportation efficiency from the design phase of product development.
1.Our wooden case is after fumigation treatment. Needn't timber inspection, saving shipping time.
2.All the spare parts of the machine were covered by the some soft materials mainly using pearl wool.
3.The outmost is wooden case with fixed formwork.
4.The bottom of the wooden case has firm iron jack, convenient to handing and transport.
customer.
2.We can send the component by DHL, TNT freely
3.Our factory can send our engineer to the customer's factory install, commission and training freely
our factory to learn the operation and maintains freely.
1.Can you supply the relevant documentation?
Yes, we can provide most documentation including Certificates of Analysis /Conformance; Insurance; Origin, and other export documents where required.
2.What kinds of payment methods do you accept?
You can make the payment to our bank account, Western Union or PayPal: 30% deposit in advance, 70% balance before delivery
3.Guaranty covers?
Main parts of the machine , wearing parts not included .PARTS DELIVERY. Within 5 days by DHL/FedEX .
4.About our after-sale service:
Customer service 24 hours online, you can send technicians to your country to repair the machine. Buyer shall bear all costs including visa, round trip airfare and suitable accommodation and buyer shall pay usd 100/day salary.
5.How to replace machine parts?
Parts adopt international brands, good quality, no need to replace within 3-5 years, convenient to buy suitable parts locally.
6.Installation&Commissioning:
Usually solved by video conference, if necessary, can be dispatched to the door installation debugging and maintenance of technical personnel.